Summary
The Minister of Transport, Highways & Urban Development has officially designated the Port Access Elevated Expressway as an expressway. This order follows a previous declaration of the road as a national highway.
What this means for you
This order formally classifies the Port Access Elevated Expressway as an expressway under the National Thoroughfares Act. It provides legal details regarding the road's length, location in the Colombo District, and its specific interchange and structural components.
Key facts
| Fact | Detail | Source |
|---|---|---|
| Who's affected | Road users, Public authorities | |
| Districts | Colombo | |
| Legal basis | Section 9(1) (a) of the National Thoroughfares Act, No. 40 of 2008 | PDF page 1 |
Where your search appears
Related gazettes
Official PDFs
Full text of the English PDF (3 pages)
Page 1
The Gazette of the Democratic Socialist Republic of Sri Lanka
EXTRAORDINARY
No. 2516/02 - MONDAY, NOVEMBER 23, 2026
(Published by Authority)
PART I : SECTION (I) — GENERAL
Government Notifications
THE NATIONAL THOROUGHFARES ACT, No. 40 OF 2008
Order under Section 9
BY VIRTUE of the powers vested in me by Section 9(1) (a) of the National Thoroughfares Act, No. 40 of 2008, I, Bimal Niroshan Rathnayaka, Minister of Ministry of Transport, Highways & Urban Development, do by this Order designate the National Highways which were declared as a National Highways by Order published in Gazette Extraordinary No. 2514/36 of November 13, 2026 and specified in Schedule to this Order to be an Expressway.
Bimal Niroshan Rathnayaka,
Minister of Transport, Highways & Urban Development.
Battaramulla,
23rd day of November, 2026.
SCHEDULE
Name of Road Section (km)
From To
Western Provinces :
1. Port Access Elevated Expressway 0.000 5.729
Page 2
(i)Name of the road : Port Access Elevated Expressway
(ii)Total Length of the road : 5.729 km (Start - 6.950383N, 79.877996E), (End-6.937031N, 79.840487E)
(iii)Province : Western
(iv)District : Colombo
(v)Plan specifying the land area :
Page 3
(vi)Interchanges along the Port Access Elevated Expressway :
Type & Roads connected at the Interchange
Serial Chainage
Name of the Interchange
No. (km) Left Right
Exclusive Connection to “Port of Colombo” Connects to Port
Ingurukade Interchange 0+400
Internal Road.
Exclusive Connection to “Port of Colombo” Connects to Port
Ramp 3 – Port of Colombo 5+120
Internal Road.
3Provision for Future Ramp Connection with partially completed
Ramp 4 – Port City/Galle
5+580 Ramps.
Face
(vii)Road Components of the Expressway:
(a)Structures
Structures of the Expressway
Serial Chainage Type River/Stream/Road Length of structure
No. (km) Name (m)
Box Girder Viaduct– Over Colombo Port
0+500 -
1 two lane dual Land including Port 5132
5+632
carriageway. Internal Road
Serial Chainage(km) Type River/Stream/Road Name Length of Ramp
No. structure
(m)
Ingurukade Interchange
box steel girder – Single Over Colombo Port Land
10+400 467 ON (Enter to PAEE)
lane including Port Internal Road
box steel girder – Single Over Colombo Port Land OFF(Exit from
2 0+410 483
lane including Port Internal Road PAEE)
Ramp 3 – Port of Colombo Interchange
0+000 - Box Girder Viaduct – Over Colombo Port Land
1397 ON (Enter to PAEE)
0+397 Single Lane including Port Internal Road
0+000 - Box Girder Viaduct – Over Colombo Port Land OFF(Exit from
2 378
0+378 Single Lane including Port Internal Road PAEE)
Ramp 4 – Port City/Galle Face Interchange – Partially completed.
0+000 - Box Girder Viaduct – Over Colombo Port Land
3300 ON (Enter to PAEE)
0+800 Dual Lane including Port Internal Road
0+500 - Box Girder Viaduct – Over Colombo Port Land OFF (Exit from
4 240
0+240 Dual Lane including Port Internal Road PAEE)
(viii)Length of Expressway : 5.729 km
(ix)Average Width of Right of Way of the Expressway : 23.5 m
EOG 11 - 0162